Home
Login Register
Interra Resource    Last:0.036   -

Interra- cheapest oil stock

 Post Reply 81-100 of 428
 
Octavia
    05-Aug-2013 21:38  
Contact    Quote!
MYANMAR DRILLING UPDATE: DRILLING COMMENCEMENT OF CHAUK DEVELOPMENT WELL CHK 1171

Interra Resources Limited (the “Company” or “Interra”) wishes to inform shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company Inc. (“Goldpetrol”), has commenced drilling development well CHK 1171 in the Chauk oil field in Myanmar.

Interra has a 60% interest in the Improved Petroleum Recovery Contract of the Chauk field and also owns 60% of Goldpetrol which is the operator of the field. CHK 1171 is being drilled using Goldpetrol’s ZJ 450 rig, thus drilling costs are expected to be relatively low. Interra’s share of the cost of drilling will be funded from existing funds on hand.

CHK 1171 will be drilled to a targeted depth of 3,200 feet as an infill development well to producing oil wells CHK 1166 and CHK 1170, with the primary objective to accelerate production from the reservoirs that produce from these two wells as well as other wells in this fault block.

Interra estimates that the results of the drilling and completion should be available in approximately six weeks. The Company will announce the results of the drilling operation as soon as they may be ascertained as well as updates reflecting critical or unexpected events during drilling.

By Order of the Board of Directors of INTERRA RESOURCES LIMITED
Marcel Tjia
Chief Executive Officer

http://infopub.sgx.com/FileOpen/Myan...& FileID=250824
 
 
Octavia
    05-Aug-2013 21:29  
Contact    Quote!
  August 2013
UNAUDITED RESULTS FOR THE QUARTER ENDED 30 JUNE 2013
Highlights in Q2 2013


 Net profit after tax for the quarter was US$4.45 million.
Revenue for the quarter was US$13.76 million, 58% higher than the preceding quarter, mainly due to higher sales of shareable production from the Tanjung Miring Timur operation which amounted to US$7.83 million.
 Shareable production for the quarter increased to 191,895 barrels from 104,501 barrels in the previous quarter.
 Earnings before divestment gain, interest income, exchange difference, finance cost, tax, depreciation, amortisation, allowance and impairment (EBITDA) for the quarter was US$8.60 million.
 Net cash outflow for the quarter was US$0.90 million, mainly due to payment of drilling costs in Indonesia.
 Cash and cash equivalents (excluding restricted cash) were US$10.35 million as at 30 June 2013.

http://infopub.sgx.com/FileOpen/Unau...& FileID=250821
 
 
Octavia
    05-Aug-2013 21:21  
Contact    Quote!

 

MYANMAR DRILLING UPDATE:

Interra Resources Limited (the "

Interra has a 60% interest in the Improved Petroleum Recovery Contract of the Yenangyaung field and also owns 60% of Goldpetrol which is the operator of the field. Due to a drilling depth that exceeds Goldpetrol’s own two drilling rig capacities, YNG 3257 is being drilled using an externally contracted Sinopec Service XJ 750 rig. Several other, deeper and more difficult wells are scheduled to be drilled in the Myanmar fields employing this rig. Interra’s share of the cost of drilling will be funded from existing funds on hand.

YNG 3257 is drilled in the producing Nyaung Do fault block located in southern Yenangyaung field as an infill development well offsetting YNG 3142, which was drilled in December 1979 but shut-in before completion. Electric log analysis clearly shows hydrocarbons in the primary 3700FT reservoir and oil was noted during drilling. YNG 3257 is drilled with the primary objective of establishing oil production in this area of the Nyaung Do fault block. There are at least four additional reservoirs that have oil production potential in this area.

Interra estimates that the results of the drilling and completion should be available in approximately eight weeks. The Company will announce the results as soon as they may be ascertained as well as updates reflecting critical or unexpected events during drilling.

By Order of the Board of Directors of

INTERRA RESOURCES LIMITED

Marcel Tjia

Chief Executive Officer
Company" or " Interra" ) wishes to inform shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company Inc. (" Goldpetrol" ), has commenced drilling infill development well YNG 3257 in the Yenangyaung oil field in Myanmar.


DRILLING COMMENCEMENT OF

YENANGYAUNG DEVELOPMENT WELL YNG 3257

 

 
halleluyah
    05-Aug-2013 19:31  
Contact    Quote!
Tomolo will fly.....vry gd results.....Mancho man has been waiting vry patiently liao.....
 
 
Octavia
    01-Aug-2013 22:09  
Contact    Quote!


So far Year 2012..interra pumped 1 m barrels...
For Year 2013..i will not  be surprised that interra pumped 2m barrels...


Huat argh....
 
 
Octavia
    01-Aug-2013 22:04  
Contact    Quote!

 

MYANMAR DRILLING UPDATE:

CHAUK DEVELOPMENT WELL CHK 1170 COMPLETED AS AN OIL PRODUCER

 

Interra Resources Limited (the " Company" or " Interra" ) wishes to inform shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company Inc. (" Goldpetrol" ), has completed drilling development well CHK 1170 in the Chauk oil field in Myanmar as an oil producer.

Interra has a 60% interest in the Improved Petroleum Recovery Contract of the Chauk field and also owns 60% of Goldpetrol which is the operator of the field. Since the well was drilled using Goldpetrol’s ZJ 450 rig, costs were comparatively low. Interra’s share of the cost of drilling was funded from existing funds on hand.

CHK 1170 was drilled to a total depth of 3,370 feet as a south offset to CHK 1166 which was completed in March 2013. The primary objective of CHK 1170 is to accelerate production from the reservoirs of this fault block. Following five days of production testing, CHK 1170 has been completed through casing perforations over ten reservoirs totalling 69 feet at 45 barrels of oil per day.

CHK 1170 marks the seventh well to be completed as an oil producer in the Chauk oil field and the thirteenth in Myanmar in 2013.

By Order of the Board of Directors of

INTERRA RESOURCES LIMITED

Marcel Tjia

Chief Executive Officer

http://infopub.sgx.com/FileOpen/Myanmar_Drilling_Update-Chauk_Devt-Well_CHK_1170_Completed_as_an_Oil_Producer.ashx?App=Announcement& FileID=250249

 

 
Gold916
    30-Jul-2013 22:35  
Contact    Quote!
Ya...I noticed this counter...got news oso didn't run much...don't know if this news will let it move or not...or open higher...

Octavia      ( Date: 30-Jul-2013 22:25) Posted:



I hope so.So far I noticed the market response  to good news for  this counter looked muted.The most up 2-3c nia.

Gd luck.

Gold916      ( Date: 30-Jul-2013 22:14) Posted:

So it will up tml


 
 
Octavia
    30-Jul-2013 22:25  
Contact    Quote!


I hope so.So far I noticed the market response  to good news for  this counter looked muted.The most up 2-3c nia.

Gd luck.

Gold916      ( Date: 30-Jul-2013 22:14) Posted:

So it will up tml?

Octavia      ( Date: 30-Jul-2013 21:28) Posted:



REPOST

PRODUCTION, DEVELOPMENT & EXPLORATION ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2013 (Q2 2013

Company's  update on  the 3 production oil fields with Tanjung Miring Timur TAC (Interra 100%) saw the largest increase in production.

Pls read more http://infopub.sgx.com/FileOpen/Activity_Report_2Q2013.ashx?App=Announcement& FileID=249813
In Q2 2013, gross production was 109,489 barrels of oil, an increase of 210% as compared to the previous quarter of 35,322 barrels of oil, mainly contributed by the new well TMT 53.


 
 
Gold916
    30-Jul-2013 22:14  
Contact    Quote!
So it will up tml?

Octavia      ( Date: 30-Jul-2013 21:28) Posted:



REPOST

PRODUCTION, DEVELOPMENT & EXPLORATION ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2013 (Q2 2013

Company's  update on  the 3 production oil fields with Tanjung Miring Timur TAC (Interra 100%) saw the largest increase in production.

Pls read more http://infopub.sgx.com/FileOpen/Activity_Report_2Q2013.ashx?App=Announcement& FileID=249813
In Q2 2013, gross production was 109,489 barrels of oil, an increase of 210% as compared to the previous quarter of 35,322 barrels of oil, mainly contributed by the new well TMT 53.

 
 
Octavia
    30-Jul-2013 21:28  
Contact    Quote!


REPOST

PRODUCTION, DEVELOPMENT & EXPLORATION ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2013 (Q2 2013

Company's  update on  the 3 production oil fields with Tanjung Miring Timur TAC (Interra 100%) saw the largest increase in production.

Pls read more http://infopub.sgx.com/FileOpen/Activity_Report_2Q2013.ashx?App=Announcement& FileID=249813
In Q2 2013, gross production was 109,489 barrels of oil, an increase of 210% as compared to the previous quarter of 35,322 barrels of oil, mainly contributed by the new well TMT 53.
 

 
Octavia
    30-Jul-2013 21:21  
Contact    Quote!


FOR THE QUARTER ENDED 30 JUNE 2013 (" Q2 2013" )



Company's  update on  the 3 production oil fields with Tanjung Miring Timur TAC (Interra 100%) saw the largest increase in production.

Read more http://infopub.sgx.com/FileOpen/Activity_Report_2Q2013.ashx?App=Announcement& FileID=249813
In Q2 2013, gross production was 109,489 barrels of oil, an increase of 210% as compared to the previous quarter of 35,322 barrels of oil, mainly contributed by the new well TMT 53.
PRODUCTION, DEVELOPMENT & EXPLORATION ACTIVITIES
 
 
muifan
    24-Jul-2013 20:16  
Contact    Quote!


bro oct, thanks for the info,

dua huat ah!

Octavia      ( Date: 24-Jul-2013 17:42) Posted:

Wait for good news by 4 Sept 13(6 weeks from today)

 
 
Octavia
    24-Jul-2013 17:42  
Contact    Quote!
Wait for good news by 4 Sept 13(6 weeks from today)
 
 
Octavia
    24-Jul-2013 17:39  
Contact    Quote!

 

MYANMAR DRILLING UPDATE:

Interra Resources Limited (the "

Interra has a 60% interest in the Improved Petroleum Recovery Contract of the Yenangyaung field and also owns 60% of Goldpetrol which is the operator of the field. YNG 3256 is being drilled using Goldpetrol’s Cooper LTO 350 rig and thus drilling costs are expected to be comparatively low. Interra’s share of the cost of drilling will be funded from existing funds on hand.

YNG 3256 is drilled as an infill development well between recently completed producing wells YNG 3251 and YNG 3254. YNG 3256 is intended to be drilled to a depth of 3,000 feet with the primary objective of accelerating oil production from the reservoirs that produce in the offset wells.

Interra estimates that the results of the drilling and completion should be available in approximately six weeks. The Company will announce the results as soon as they may be ascertained as well as updates reflecting critical or unexpected events during drilling.

By Order of the Board of Directors of

INTERRA RESOURCES LIMITED

Marcel Tjia

Chief Executive Officer
Company" or " Interra" ) wishes to inform shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company Inc. (" Goldpetrol" ), has commenced drilling infill development well YNG 3256 in the Yenangyaung oil field in Myanmar.


DRILLING COMMENCEMENT OF

YENANGYAUNG DEVELOPMENT WELL YNG 3256

 
 
muifan
    24-Jul-2013 12:02  
Contact    Quote!


cutted my interra contra, loss 4 pips...jeep 505 cut 485

waiting for next jeep now....

huat to all!
 

 
novice_trader
    23-Jul-2013 23:47  
Contact    Quote!
My experience from interra... Sell when good news comes... I always hold hoping after good news will fly, but always end flying dwn instead. I might be wrong... I'm always waiting to jeep in this counter. In my WL...
 
 
retsel
    23-Jul-2013 23:00  
Contact    Quote!
Think 110 bpd is really quite low. Maybe mkt disappointed with output... Need >1000 bpd to excite mkt
 
 
muifan
    23-Jul-2013 13:44  
Contact    Quote!


Just came back singapore from work,

just saw the good news but weird the stock did not move much

hopefully can chiong chiong chiong ahhhhhhhhhhh
 
 
Octavia
    23-Jul-2013 08:39  
Contact    Quote!
Hopefully can gap up at opening.
 
 
Octavia
    22-Jul-2013 22:32  
Contact    Quote!


huat arghhhhhhhhhhhhhh another 110 bpd..

Expect more goodie bags on the way.

Congrats to all those vested.

 
 
Important: Please read our Terms and Conditions and Privacy Policy .